surveying indirect leveling ₪ Verification measures

surveying indirect leveling ₪ Verification measures

In fact the distance 56.92m was measured along the slope AB .

For verification, you also note the following, values :

 From the station at A, read the vertical angle at point B.
 From the station in B, read the vertical angle on A and N.

Repear the calculations from A znf check them from B. You Will calculate the akltitude of B on the way .
nivellement, topographie,direct, indirect,point,inaccessible

Post a Comment

0 Comments